Interstate 30 (I-30) westbound traffic in Saline County will shift onto new pavement overnight from 9 p.m. Thursday, June 20 through 6 a.m. Friday, June 21. Weather permitting, I-30 westbound traffic between Highway 67/229 (Exit 114) and Highway 70 (Exit 111) will move from the existing main lanes onto new pavement toward the median. […]
City of Benton to add another lane in big intersection
The City of Benton plans a pattern change soon for the intersection of Carpenter Street and Military Road. This is where Walgreens would be on your left and Circle K on your right. If you are turning left from that direction, you will be able to do so from two lanes. See the picture above […]
ARDOT to close 2 ramps on Friday for I-30 Westbound
Construction to widen Interstate 30 (I-30) to six lanes in Saline County will require closing the I-30 westbound off- and on-ramps at South Street (Exit 116) during overnight hours 10 p.m. Friday, June 7 through 6 a.m. Saturday, June 8 in Saline County. See the detour map below, provided by ARDOT. The I-30 westbound […]
ARDOT to close one lane Monday night on Highway 67 in Saline County
Construction to widen Interstate 30 (I-30) to six lanes in Saline County requires flagging operations along Highway 67 overnight from 9 p.m. Monday, June 3 until 5 a.m. Tuesday, June 4. Weather permitting, crews will alternately close a single lane on Highway 67 to perform pavement operations and shift traffic to the east onto new […]
ARDOT to close a ramp at 30/70 intersection May 29 – See the 2 detour options
There will be pavement repairs Wednesday night that will require ARDOT to close a ramp from Highway 70 east to I-30 east. This will happen beginning 9 p.m. Wednesday, May 29 until 5 a.m. Thursday, May 30, 2024. 👇SEE DETOUR AND INFO BELOW Traffic will not be able to use the Highway 70 ramp to […]
ARDOT to open 2 entrance ramps to I-30 Westbound
Two ramps were scheduled to open last week but weather postponed that event to Tuesday night. These ramps go to I-30 westbound at the Highway 67/229 interchange. The traffic switch is now scheduled to take place overnight from 9 p.m. Tuesday, May 28 to 6 a.m. Wednesday, May 29. See the detour map below, provided […]
ARDOT to open two new entrance ramps to I-30 in Saline County
Construction to widen Interstate 30 to six lanes in Saline County requires transitioning traffic onto two new entrance ramps to I-30 westbound at the Highway 67/229 interchange; the switch to the new ramps will happen overnight between 9 p.m. Thursday, May 23 and 6 a.m. Friday, May 24. READ MORE AND SEE MAP BELOW As […]
Come to ARDOT’s meeting Jun 18 for proposed Hwy 5 widening in Bryant
The public is invited to a hearing concerning the location and design for a widening project in Bryant. The Arkansas Department of Transportation (ARDOT) and the Federal Highway Administration (FHWA), with support from ARDOT consultant Garver, will conduct a Location and Design Public Hearing Tuesday, June 18 from 4-7 p.m. to present and discuss the […]
ARDOT to close a ramp at 30/70 intersection on May 20th
Construction to widen Interstate 30 (I-30) to six lanes in Saline County will require ARDOT to close the Highway 70 ramp to I-30 east. This will be overnight from 9 p.m. Monday, May 20 through 5 a.m. Tuesday, May 21. According to ARDOT, it’s for for pavement repairs. This is part of construction to widen […]
ARDOT to schedules work Sunday night at South Street bridge in Benton
Look for ARDOT to restripe the pavement on Interstate 30’s South Street bridge on Sunday night. This is part of a construction project to widen I-30 to six lanes in Saline County. This will require flagging operations along South Street Bridge and the following surrounding roads from 9 p.m. Sunday, May 19 to 6 a.m. […]
- « Previous Page
- 1
- 2
- 3
- 4
- 5
- …
- 17
- Next Page »