The Benton Streets and Drainage is rescheduled to Wednesday, Feb. 22nd at 5:00 in the Council Chambers. Social distancing guidelines will be followed and face masks are required upon entering the building. The agenda is below.
1. Call to order
2. Recognition of attendees
3. Approval of minutes
4. Oak Creek Village low bid acceptance
5. Discussions on Sagecrest low bid (Feb 17th)
6. McClelland updates
7. Streets and drainage updates
8. Adjourn
STREETS AND DRAINAGE UPDATE
February 4, 2021
RECENTLY COMPLETED
Brownwood Subdivision- curb work
Dale Street- Ball Park Washout
IN PROGRESS
Sidell-replace culvert
1410 Lenore-replace culvert
816 Teresa-replace culvert
1207 Crystal-Drainage
Kenwood/Hwy 5-signal upgrade
E North Street-Drainage
Hiland sidewalks and curbs
2218 Chatfield-replace culvert
3620 Gattin-replace culvert
FUTURE
Cox St-sidewalk repairs
Miller Cove-Drainage
Greenfield-Drainage
708 Fernwood-Drainage
Lyledale-Drainage
Misty near Volcanic-Drainage
Market Street-sidewalk repairs
River Oaks-Drainage
3306 Cottonwood-Drainage
2808 Valley Forge-Drainage
Eagle Point-concrete road repair
Wellington Point-concrete road repair
3123 Bastogne Way-Drainage
E North Street-Drainage
Benton Projects –Update
February 4, 2021
Benton Street Department Projects:
1. East Lakeview Drive:
a. Project awarded to Boyles Construction.
b. Construction has begun, silt fence out, starting on Gabion Baskets.
2. Newcomb Rd. Sidewalks:
a. Project has begun. Trees have been removed that were in the way of construction.
Sidewalk has been moved to directly behind back of curb due to resident’s requests.
Construction is 50% complete
3. Shenandoah Bridge:
a. Project bid, Low bidder is Hydco for $696,650.00. Road has closed. Construction is in the
beginning stages
4. Princeton and Montclair:
a. 100% of construction is complete. Walk through of project is 1/4/21.
b. Walk through has been completed and the punch list is being finished.
5. ADA Self Evaluation and Transition Plan
a. MCE staff has finished on report. Supervisor reviewing report currently.
6. New Projects/Work Orders (TAP Grants submitted on July 1 st ):
a. Smithers Drive – TAP Application submitted to ARDOT and awarded. Contract w/MCE
has been signed.
7. Congo / Shenandoah Roundabout (Metroplan Funding) – Currently waiting on Metroplan to
pick their on call consultants.
8. Sevier St Sidewalks – 30% submittal done. Currently being reviewed by the City and then
sending it to ARDOT.
9. 3 Drainage Projects (State Funded):
a. Oak Creek Village – Design finished. Contract Bid, certified bid tab is attached.
b. Sage Crest Creek – Design is finished. Will bid 2/17/21.
c. Westbrook Creek – Design is 100% complete. Plans will bid on 3/4/21.
Benton Parks Projects:
1. Tyndall Park west parking lot – Construction has begun.
Oak Creek Village Drainage Improvements
[pdf-embedder url=”https://www.mysaline.com/wp-content/uploads/2021/02/20-5832-CBT.pdf” title=”20-5832 CBT”]