Expect more lane closures in April, as the job continues for widening Interstate 30 in Saline County to six lanes.
According to the Arkansas Department of Transportation (ARDOT), on days that weather permits it, construction crews will be working in the eastbound and westbound lanes between U.S. Highway 70 (Exit 111) and Sevier Street in Benton (Exit 116).
Crews will periodically close traffic lanes from April 1st – 30th. Depending on the location, an inside or outside lane will be closed to allow crews to work.
Under lane closure conditions, eastbound or westbound traffic will be reduced to one open lane between 9 p.m. and 10 p.m. during overnight hours, and all lanes will reopen no later than 6 a.m. the following morning.
Traffic will be controlled with construction barrels and signage, along with assistance from the Arkansas Highway Police. The public is advised to be cautious when traveling in the work zone and watch for slower traffic speeds. Areas adjacent to the Interstate may experience noise impacts during nighttime hours.
This project (Job CA0601) is part of ARDOT’s Connecting Arkansas Program and includes widening 5.5 miles of Interstate 30 to three lanes in each direction, from the interchange with U.S. Highway 70 (Exit 111) to Sevier Street in Benton (Exit 116). The project also includes improvements at the Highway 67 interchange (Exit 114). More information on this $187.3 million project is available at ConnectingArkansasProgram.com.
Drivers should exercise caution when approaching and traveling through all highway work zones. Additional travel information can be found at IDriveArkansas.com or ARDOT.gov. You can also follow us on Twitter @myARDOT.